Slash Command292 estrellas del repoactualizado 2d ago
workflow-foundation-to-design
This command runs a connected 7-8 day workflow combining a 2-day Foundation Sprint (establishing strategic alignment and a Founding Hypothesis) with a 5-day Design Sprint (validating that hypothesis through prototype testing). Use this when you need to move from strategic question to validated customer feedback in a single, narrative-connected arc, where the riskiest assumptions identified during foundation work become the Design Sprint's testing focus.
Instalar en Claude Code
Copiarmkdir -p ~/.claude/commands && curl -fsSL https://raw.githubusercontent.com/product-on-purpose/pm-skills/HEAD/commands/workflow-foundation-to-design.md -o ~/.claude/commands/workflow-foundation-to-design.mdDespués abre una sesión nueva de Claude Code; el slash command carga automáticamente.
Definición
workflow-foundation-to-design.md
Run the end-to-end arc that pairs a Foundation Sprint (2 days of strategic alignment) with a Design Sprint (5 days of prototype validation) as one connected 7-8 day flow. There is no bridge skill: canonical Knapp/Zeratsky methodology has no formal handoff move between the two sprints, and pm-skills does not invent one. The Founding Hypothesis from the Foundation Sprint is consumed directly as input context by the Design Sprint readiness and brief steps; the handoff is narrative only. ## Workflow Steps ### Step 1: Foundation Sprint (Days 1-2) Run the full Foundation Sprint using the `/workflow-foundation-sprint` command (or follow `skills/tool-foundation-sprint-readiness/SKILL.md` through `skills/tool-foundation-sprint-founding-hypothesis/SKILL.md` in sequence). Output: a canonical Founding Hypothesis sentence plus an assumption scorecard. ### Step 2: Narrative handoff Carry the Founding Hypothesis and its highest-risk assumptions forward as the framing context for the Design Sprint. No intermediate artifact is required: the riskiest assumption on the scorecard typically becomes the Design Sprint's challenge and sprint questions. See `docs/guides/using-foundation-sprint.md` and `docs/guides/using-design-sprint.md` for the handoff narrative. ### Step 3: Design Sprint (Days 3-8) Run the full Design Sprint using the `/workflow-design-sprint` command (or follow `skills/tool-design-sprint-readiness/SKILL.md` through `skills/tool-design-sprint-test-and-score/SKILL.md` in sequence), seeding the readiness and brief steps with the Founding Hypothesis from Step 1. Output: the Decider's build / iterate / pivot / stop call grounded in five customer interviews. ## Output A strategic frame (Founding Hypothesis) validated or invalidated end-to-end by a tested prototype and a Decider's call, in one connected arc. Reference the end-to-end workflow at `_workflows/foundation-to-design.md` for the full narrative, including the handoff guidance. Context from user: $ARGUMENTS
Del mismo repositorio
pm-changelog-curatorSubagent
|
pm-criticSubagent
|
pm-release-conductorSubagent
|
pm-skill-auditorSubagent
|
pm-workflow-orchestratorSubagent
>-
workflow-customer-discoverySlash Command
Run the Customer Discovery workflow (research -> JTBD -> opportunities -> problem)
workflow-design-sprintSlash Command
Run the Design Sprint workflow (5-day prototype-and-test arc producing a Decider's build/iterate/pivot/stop call)
workflow-feature-kickoffSlash Command
Run the Feature Kickoff workflow (problem -> hypothesis -> PRD -> stories)