Skill182 repo starsupdated 5d ago
prd-v08-runbook-creation
>
Install in Claude Code
Copygit clone --depth 1 https://github.com/mattgierhart/PRD-driven-context-engineering /tmp/prd-v08-runbook-creation && cp -r /tmp/prd-v08-runbook-creation/.claude/skills/prd-v08-runbook-creation ~/.claude/skills/prd-v08-runbook-creationThen start a new Claude Code session; the skill loads automatically.
Definition
SKILL.md
# Runbook Creation Position in workflow: v0.8 Release Planning → **v0.8 Runbook Creation** → v0.8 Monitoring Setup ## Execution Mode Default is **standard**. See [`.claude/rules/08-skill-execution-modes.md`](../../rules/08-skill-execution-modes.md) for selection logic. | Mode | What this skill produces | |------|--------------------------| | **quick** | 2–3 runbooks covering the top RISK-/MON- pairs | | **standard** | Incident + deployment + maintenance runbooks linked to MON- and DEP-, with escalation paths | | **deep** | Full matrix + drill schedule + recovery scenarios + tabletop exercise outputs | ## Consumes This skill requires prior work from v0.8 Release Planning and earlier stages: - **DEP-\* deployment entries** (from v0.8 Release Planning) — Deployment procedures from DEP- rollback/validation sections inform RUN- deployment and recovery runbooks - **RISK-\* risk entries** (from v0.5 Risk Discovery) — High/medium RISK- entries must have response runbooks; mitigations become procedures - **MON-\* monitoring specifications** (planned from v0.8 Monitoring Setup, or anticipated) — Key alerts from MON- (before formalization) inform incident response runbooks; runbooks will be referenced FROM monitoring - **ARC-\* architecture decisions** (from v0.6 Architecture Design) — System structure (single service vs microservices, databases, integrations) determines incident scope and escalation paths - **TECH-\* technology stack** (from v0.5 Technical Stack Selection) — Technology choices (database, cloud provider, APM tools) determine specific commands and tools in runbook procedures - **API-\* endpoint contracts** (from v0.6 Technical Specification) — For reference if incident involves specific endpoints or payloads This skill assumes DEP- entries are complete with rollback procedures and post-deploy validation steps defined. ## Produces This skill creates/updates: - **RUN-\* entries** (operational runbooks, category-based) — Step-by-step procedures for incident response, deployment execution, maintenance tasks, recovery from failures, and escalation paths - **Incident response matrix** — Mapping of scenarios (connection pool exhaustion, latency spike, deployment failure, etc.) to RUN- procedures - **Runbook cross-reference** — Links from RUN- procedures to DEP- rollback conditions, anticipated MON- alerts, and RISK- entries they address All RUN- entries are **operational procedures**, not confidence-based. They are: - **Executable** (numbered steps with specific commands and tools) - **Verifiable** (each step has a verification check confirming success) - **Scoped** (explicit "Handles" and "Does NOT handle" sections) - **Escalatable** (clear escalation paths and contact information) - **Tested** (should be drilled regularly; includes "Last Tested" date) Example RUN- entries: ```markdown RUN-001: Database Connection Pool Exhaustion Category: Incident Trigger: MON-005 alert (connection pool >90%) — from v0.8 Monitoring Setup Owner: Backend Team Last Tested: 2025-02-20 ## Scope - **Handles**: Connection pool saturation, slow queries causing pooling - **Does NOT handle**: Database server crash (see RUN-010), Network failure (see RUN-011) ## Prerequisites - [ ] Access to AWS RDS console - [ ] PostgreSQL read credentials in LastPass - [ ] PagerDuty access for escalation - [ ] Datadog dashboard access (MON-005 source) ## Procedure ### Step 1: Verify Alert Check current connection pool status: Commands: \`\`\`sql SELECT count(*) FROM pg_stat_activity WHERE state = 'active'; SELECT * FROM pg_stat_activity WHERE state = 'active' ORDER BY query_start; \`\`\` Verification: - [ ] Connection count ≥90% of max pool (check DEP-001 pool config) ### Step 2: Identify Problematic Queries Find long-running or blocked queries: Commands: \`\`\`sql SELECT pid, now() - pg_stat_activity.query_start AS duration, query FROM pg_stat_activity WHERE (now() - pg_stat_activity.query_start) > interval '5 minutes'; \`\`\` Verification: - [ ] At least one query identified running >5 minutes ### Step 3: Kill Problematic Queries (if safe) Only kill queries that are clearly stuck: Commands: \`\`\`sql SELECT pg_terminate_backend(pid) FROM pg_stat_activity WHERE pid = <problematic_pid>; \`\`\` Verification: - [ ] Connection count dropping within 2 minutes - [ ] MON-005 alert resolving ### Step 4: Investigate Root Cause - Check recent deployments (last 24h via git log) - Review application logs for query patterns (Datadog logs) - Check for missing indexes on recent queries ## Escalation - **When to escalate**: Issue persists >15 minutes, data integrity concern, cannot kill queries safely - **Who to contact**: Database Team Lead (Slack: @db-team, PagerDuty) - **What to provide**: Timeline, queries identified, actions taken, connection count trend ## Post-Incident - [ ] Document incident timeline (who was paged, when actions taken) - [ ] File ticket for query optimization if needed - [ ] Update this runbook if steps were wrong/missing - [ ] Schedule team drill of this runbook within 1 week if escalated Linked IDs: MON-005 (alert), DEP-001 (pool config), RISK-008 (data integrity) --- RUN-002: Production Deployment Procedure Category: Deployment Trigger: Scheduled release when all DEP- criteria met Owner: DevOps Team Last Tested: 2025-02-18 ## Scope - **Handles**: Standard production deployments (mainline releases) - **Does NOT handle**: Hotfix deployments (see RUN-003), Database migrations (see RUN-004), Emergency rollback (see RUN-005) ## Prerequisites - [ ] All DEP- criteria verified - [ ] DEP-002: All tests pass in staging - [ ] DEP-003: No critical RISK- blockers - [ ] DEP-004: Security review complete - [ ] Staging deployment successful - [ ] Release approval from Tech Lead in #deployments channel - [ ] On-call engineer available for rollback (next 30 minutes) ## Procedure ### Step 1: Pre-Deploy Announcement Notify stakeholders of upcoming deployment: Commands: \`\`\`bash ./scripts/noti