Skip to main content
ClaudeWave
EN, English
Skill755 repo starsupdated 8d ago

tool-design-sprint-brief

This Claude Code skill generates a signed team contract that locks in all critical Design Sprint parameters, including the testable challenge, sprint questions, team roles, customer recruiting logistics, prototype medium, interview format, and success metrics, before Monday begins. Use it after a Go readiness verdict to prevent Monday morning debates and to communicate sprint scope to skeptics or stakeholders in a concise two-page format.

Install in Claude Code
Copy
git clone --depth 1 https://github.com/product-on-purpose/pm-skills /tmp/tool-design-sprint-brief && cp -r /tmp/tool-design-sprint-brief/skills/tool-design-sprint-brief ~/.claude/skills/tool-design-sprint-brief
Then start a new Claude Code session; the skill loads automatically.

SKILL.md

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

# Design Sprint Brief

Produce the brief that aligns the team on challenge, sprint questions, participants, customer recruiting, prototype medium, interview format, logistics, and success criteria before Monday begins. A well-built brief prevents Monday morning from opening with re-litigation of "what are we testing this week?"; a missing or vague brief almost guarantees it.

Family contract: [`docs/reference/skill-families/design-sprint-skills-contract.md`](../../docs/reference/skill-families/design-sprint-skills-contract.md). This skill is a member of `design-sprint-skills`.

## When to Use

- The readiness verdict from `tool-design-sprint-readiness` is Go (or Conditional Go with preconditions cleared).
- The sprint has dates blocked on calendars and you need the artifact that names what the sprint is for.
- The team has customer recruiting active and you need to commit a recruiting plan, honorarium budget, and Friday schedule before recruiting closes.
- A skeptical exec wants to know "what is the team doing for five days plus customer cost?" and you need an answer that fits on two pages.

## When NOT to Use

- The sprint has already started. The brief is a prep artifact, not an in-sprint deliverable. If Monday is happening, run `tool-design-sprint-map-and-target` instead.
- The readiness verdict is Wait. The brief cannot fix an unready team; close the preconditions first, then re-run readiness, then invoke this skill.
- The team wants a stakeholder strategy document. The brief is internal prep, not an external deliverable. If a stakeholder document is needed, that is a downstream artifact (the Friday scorecard or the next-step memo).
- Customer recruiting has not started. The brief locks the recruiting plan but cannot replace the recruiter. If no recruiter is named, go back to readiness Wait verdict.

## What This Skill Produces

A single bundled artifact with nine sections:

1. **Challenge statement and why-now**: one paragraph naming the testable challenge and the urgency that justifies a sprint this week vs. later.
2. **Sprint questions**: 2-4 specific questions the Friday testing answers. The highest-risk assumption from any prior Foundation Sprint becomes the lead question.
3. **Decider attendance windows**: the load-bearing moments (Mon AM, Wed AM, Fri PM at minimum); fully blocked if available.
4. **Team roster with role assignments**: who is in the room each day and what role each person plays through the week.
5. **Customer recruiting plan**: target profile, source, count, incentive, recruiter owner, recruiting deadline, Friday schedule.
6. **Prototype medium decision**: clickable, slideware, service role-play, paper, physical mock, or other; with rationale.
7. **Interview format**: live or remote; moderated or unmoderated; recording and consent posture; observer-room setup.
8. **Logistics plan**: dates, hours, location, format (in-person, remote, hybrid), tools, daily rhythm.
9. **Success criteria**: observable outcomes that mark the sprint successful or not.

See `references/TEMPLATE.md` for the canonical structure and `references/EXAMPLE.md` for the Brainshelf book-catalog brief.

## Inference Inputs

| Input | What the skill does with it |
|---|---|
| Readiness verdict and recommendations (from `tool-design-sprint-readiness`) | Pulls the recommended attendees, customer recruiting plan, pre-sprint activities, and prototype medium proposal; flags any precondition that has not been closed |
| Challenge description | Compresses into the Challenge Statement and derives 2-4 sprint questions |
| Founding Hypothesis (optional; from a prior Foundation Sprint) | The highest-risk assumption from the FS scorecard becomes the lead sprint question; the top bet becomes the design direction; the backup becomes the fallback decision if Friday invalidates |
| Team roster | Maps people to the required Design Sprint roles (Decider, Facilitator, PM, Design, Engineering, Researcher or Customer Expert); confirms 4-7 person band |
| Customer recruiting source and plan | Locks recruiter owner, target profile, source channel, honorarium budget, deadline, and Friday schedule |
| Format (in-person, remote, hybrid; per Ratified Decision 6) | Branches the brief body where format affects authoring: recruiting plan (in-person requires geo-local cohort; remote allows cross-timezone), prototype medium (some media work better in-person; e.g., physical mock), interview format (live vs remote moderated), observer setup (in-room vs Zoom breakout room) |
| Logistics constraints | Produces the dates/hours/location/tools matrix; flags any constraint that would force the sprint to extend beyond 5 days or split across calendar weeks |

## Brief Length Discipline

The brief MUST fit on two pages (or two screens). The DS brief is intentionally longer than the FS brief because the customer-recruiting, prototype-medium, and interview-format sections have no FS equivalent and must be committed to before Monday.

- Challenge Statement: one paragraph, four sentences maximum.
- Sprint Questions: 2-4 numbered questions, each one sentence.
- Team Roster: table with one row per person.
- Customer Recruiting: table.
- Prototype Medium: one paragraph including rationale.
- Interview Format: one paragraph.
- Logistics: table.
- Success Criteria: 3-5 bulleted outcomes.

If the brief expands beyond two pages, the sprint is being over-engineered before it starts. The fix is not a longer brief; the fix is sharper sprint questions and a clearer prototype medium decision.

## Common Pitfalls

- **Vague sprint questions.** "Will users like it?" is not a sprint question. "Will 25+/year readers complete sub-3-second camera capture without abandoning?" is. Sprint questions must be answerable from Friday's 5-customer interviews.
- **Recruiting plan that does not match target customer.** Recruiting from a panel that skews younger or different demographics t
chainSlash Command

Run an ad-hoc ordered chain of pm-skills with shared context (ephemeral; routes to the pm-workflow-orchestrator)

define-hypothesisSkill

Defines a testable hypothesis with clear success metrics and a validation approach. Use when forming assumptions to test or aligning a team on what success looks like, before any experiment is designed. To design the A/B test or experiment that will validate the hypothesis, use measure-experiment-design.

define-jtbd-canvasSkill

Creates a Jobs to be Done canvas capturing the functional, emotional, and social dimensions of a customer job. Use when deeply understanding customer motivations, designing for jobs, or reframing product positioning.

define-opportunity-treeSkill

Creates an opportunity solution tree connecting a desired outcome to customer opportunities and candidate solutions, preventing solution-first jumps in continuous discovery. Use when structuring scattered feature ideas or communicating how the roadmap traces to outcomes. For ranking an existing flat list of candidates, use define-prioritization-framework instead; this skill discovers the list, it does not score one.

define-prioritization-frameworkSkill

Run applicable prioritization frameworks (RICE, ICE, MoSCoW, Weighted Scoring, Kano) against a list of features or initiatives. Produces a comparison table showing where rankings agree and diverge across frameworks, and an executive summary with recommendation. Framework applicability is filtered by data availability; Kano requires customer research. Refuses to fabricate scores; produces an estimation scaffold when input data is missing.

define-problem-statementSkill

Creates a clear problem framing document with user impact, business context, and success criteria. Use when starting a new initiative, realigning a drifted project, or communicating up to leadership.

deliver-acceptance-criteriaSkill

Generates structured Given/When/Then acceptance criteria for a user story or feature slice, covering the happy path, key failure scenarios, and non-functional expectations in testable form. Use when turning requirements into verifiable scenarios for engineering handoff and QA sign-off. For a dedicated catalog of boundary conditions, error states, and recovery paths across a feature, use deliver-edge-cases; to write the stories themselves, use deliver-user-stories.

deliver-edge-casesSkill

Documents edge cases, error states, boundary conditions, race conditions, and recovery paths for a feature - the systematic catalog of what can go wrong and the failure modes to design for. Use during specification to map the failure surface and ensure comprehensive coverage, or during QA planning to identify boundary and limit scenarios to test. Distinct from deliver-acceptance-criteria, which writes story-level Given/When/Then checks; this skill produces the whole-feature edge-case catalog.