tool-foundation-sprint-readiness
This skill runs a 30-45 minute diagnostic to determine whether a team should proceed with a Foundation Sprint now, defer it, or complete prerequisites first. It produces a Go, Conditional Go, or Wait verdict along with specific diagnosis, recommended preconditions, attendee requirements, and preparatory activities. Use it when a team is considering committing two days to a Foundation Sprint and wants structured validation before scheduling rather than relying on informal judgment.
git clone --depth 1 https://github.com/product-on-purpose/pm-skills /tmp/tool-foundation-sprint-readiness && cp -r /tmp/tool-foundation-sprint-readiness/skills/tool-foundation-sprint-readiness ~/.claude/skills/tool-foundation-sprint-readinessSKILL.md
<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 --> # Foundation Sprint Readiness Assess whether a Foundation Sprint fits the team's current situation. Most sprints that fail were sprints that should not have been run. A 30-45 minute readiness diagnostic catches that failure mode before two days of facilitated work are spent. Family contract: [`docs/reference/skill-families/foundation-sprint-skills-contract.md`](../../docs/reference/skill-families/foundation-sprint-skills-contract.md). This skill is a member of `foundation-sprint-skills` and conforms to the family frontmatter and Decider Checkpoint requirements. ## When to Use - A team is considering starting a Foundation Sprint and needs a fast diagnosis before committing two days. - A founder or PM has a "should we run a Foundation Sprint?" question and wants structured input rather than a vibes check. - An existing sprint commitment is on the calendar and the team wants to validate that prerequisites are in place. - Re-running a Foundation Sprint after invalidated assumptions: use to confirm new context is ready. ## When NOT to Use - The team has already decided to run the sprint and just needs the brief. Use `tool-foundation-sprint-brief` instead. - The team needs deep customer discovery: run customer research or problem framing first; the Foundation Sprint depends on existing customer knowledge. - The decision is small and a full Foundation Sprint is overkill. Use a lighter prioritization or decision tool. - No Decider is available and one cannot be appointed. Foundation Sprint requires fast strategic calls; without authority it produces options without commitment. ## What This Skill Produces A single bundled artifact with five sections: 1. **Readiness verdict**: Go / Conditional Go / Wait 2. **Diagnosis**: what is in place, what is missing, what is uncertain 3. **Recommended preconditions** (when verdict is Wait or Conditional Go): the prerequisite work the team should do before the sprint 4. **Recommended attendee list** (when verdict is Go or Conditional Go): the 3-5 people who should be in the room, with role expectations 5. **Pre-sprint activities** (when verdict is Go): the prep work to complete in the days before Day 1 See `references/TEMPLATE.md` for the canonical structure and `references/EXAMPLE.md` for a worked example using the Brainshelf book-catalog thread. ## Inference Inputs The skill runs an inference pass over these inputs to produce the verdict: | Input | What the skill does with it | |---|---| | Initiative description | Determines whether a Foundation Sprint is the right tool (vs problem framing, customer research, or a Design Sprint) | | Team composition draft | Checks roster against the Foundation Sprint role requirements; flags missing roles | | Decider name and availability | Confirms Decider can attend both days; flags partial availability as Conditional Go risk | | Existing customer/market knowledge level (self-assessed 1-10) | Below 5 indicates deep discovery is needed first; 5-7 indicates Conditional Go with research prep; 8+ indicates Go | | (Optional) Existing competitor and alternative knowledge | Flags gaps that can be closed by overnight prep | | (Optional) Logistics constraints | Confirms two days can actually be cleared | If a load-bearing input is missing or low-confidence, the skill flags it explicitly and proposes how to close the gap before the sprint. ## Readiness Criteria (8 Canonical Checks) The skill evaluates the team against these eight criteria, drawn from Knapp/Zeratsky (Click) and Character Capital's Foundation Sprint guide: 1. **Initiative is named and concrete.** The team can name the project, product area, or strategic question. 2. **The stakes are meaningful.** A wrong starting direction would be costly. 3. **The team has existing knowledge.** Real customer, market, competitor, or domain context to make informed choices. 4. **The Decider is available.** Strategic calls can be made during the sprint. 5. **The team is small enough.** No more than five core decision participants is preferred. 6. **Inputs are collected.** Existing research, customer examples, competitor notes, metrics are ready. 7. **The output has a path to testing.** The team can use a Design Sprint, experiment, customer research, or another validation method afterward. 8. **The organization tolerates explicit tradeoffs.** Foundation Sprint forces choosing a top bet and a backup, not preserving every possibility. | Pattern | Verdict | |---|---| | All 8 criteria met cleanly | **Go** | | 1-2 criteria are "yellow flags" but addressable in evening prep | **Conditional Go** with documented prep | | 3 or more criteria fail, or any of 1-4 is a hard fail | **Wait** with recommended prerequisite work | Treat the criteria as load-bearing, not a checklist to game. A team that papers over a real gap with "yes, technically" should get a Conditional Go with the gap surfaced. ## Common Pitfalls - **Skipping the diagnostic because "we're going to run it anyway."** This is the most common cause of failed sprints. The diagnostic costs 45 minutes; the failed sprint costs 16 hours of team time plus opportunity cost. - **Treating Conditional Go as Go without doing the prep.** Conditional Go means "Go after closing these gaps." If the gaps are not closed by Day 1 morning, the sprint enters the failure mode the diagnostic was meant to prevent. - **Confusing readiness assessment with problem framing.** This skill assesses whether to run a Foundation Sprint, not whether the team has the right problem. If the problem is unclear, the verdict is Wait with "do problem framing first" as the precondition. - **No Decider, no sprint.** A team with no Decider available is not ready, full stop. Appointing a "Decider for the day" who lacks real authority does not solve this. - **Cargo-cult readiness.** Reading the criteria and answering yes to all eight without checking does not produce readiness. Th
|
|
|
|
>-
Run the Customer Discovery workflow (research -> JTBD -> opportunities -> problem)
Run the Design Sprint workflow (5-day prototype-and-test arc producing a Decider's build/iterate/pivot/stop call)
Run the Feature Kickoff workflow (problem -> hypothesis -> PRD -> stories)