Skip to main content
ClaudeWave
Skill333 repo starsupdated today

integration-orchestrator

The integration-orchestrator skill generates a phased delivery timeline for creative projects, defining when decisions lock, who reviews what, which tasks block others, and how handoffs occur across team tools like Jira, Linear, Notion, Figma, and GitHub. Use it when starting a new creative project, fixing mid-flight scheduling breakdowns where brief drift causes rework, establishing measurable QA gates, or implementing agent-driven workflows with structured phase gates and artifact requirements that replace ad-hoc coordination.

Install in Claude Code
Copy
git clone --depth 1 https://github.com/rampstackco/claude-skills /tmp/integration-orchestrator && cp -r /tmp/integration-orchestrator/dist/pi/.agents/skills/integration-orchestrator ~/.claude/skills/integration-orchestrator
Then start a new Claude Code session; the skill loads automatically.

SKILL.md

# Integration Orchestrator

A brief tells a team what to make. Creative direction tells them what it should feel like. Neither tells them when each decision locks, who reviews what, or what stops the next phase from starting before the prior one is done. That is the gap this skill fills.

The output is a phased orchestration plan the PM can paste into a calendar Monday morning and start running Tuesday. Phases, gates, lock points, handoffs, QA verification rules, and a platform-specific implementation guide for whatever stack the team actually uses (Jira, Linear, Notion, Figma, GitHub, agile sprints).

---

## What this skill is

A creative-direction project has three layers. The brief layer defines scope, audience, deliverables, constraints, success criteria. The direction layer defines tone, aesthetic, relationship, and sensory ambition. Both produce written artifacts. Neither answers the temporal question: when does the brief lock, when does identity lock, when does copy lock, who reviews each, what gets blocked while a gate is open, what happens when a downstream task discovers the brief is wrong, and what makes "Done" mean tested rather than self-reported.

This skill produces that temporal layer. Most teams have briefs and creative direction but no orchestration plan. The result, by week 3, is everyone working in parallel with no shared sense of which decisions are still open and which are locked. Brief drift. Re-work. Identity tokens shifted after copy was already drafted against the old ones. Engineering shipping before design had a chance to review. "Done" tickets that were never actually verified.

The orchestration plan answers all of that. It is not theory. It is a phased timeline with calendar weeks, ticket templates the PM can paste into Jira or Linear, MCP commands for setup, gate definitions with measurable pass criteria, handoff specs with artifact requirements, and QA verification gates with Playwright or Chrome MCP invocations.

---

## When to use

- Starting a new brand build, rebrand, or campaign and the team needs to sequence the work
- Mid-flight project where the brief is being revisited and downstream work is suffering from constant resets
- Setting up a new team's agent-driven workflow with MCPs and CLI integration
- Multi-team work where handoffs between brand, design, and engineering have broken down
- Establishing QA verification gates so "Done" is measurable, not self-reported
- Migrating from ad-hoc orchestration to a documented cadence
- Onboarding a new PM or design lead onto an existing project that has running tickets but no documented sequencing
- Adding new platforms or tools to an existing workflow and the cadence needs to be re-mapped

---

## When NOT to use

- Use `creative-brief` instead if the deliverable is the project brief itself: scope, audience, deliverables, constraints, success criteria. The orchestrator skill takes the brief as input.
- Use `creative-direction` if the deliverable is the aesthetic direction: tone, aesthetic, relationship, sensory. The orchestrator schedules the work that answers to the direction; it does not produce the direction.
- Generic project management software is the platform; this skill produces the plan that runs IN the platform. Do not run this skill if the team needs help picking a tool; it assumes the tool stack is already chosen.
- Sprint-planning tactics (story-pointing, retros, velocity charts) live downstream of orchestration. The skill produces the cadence; sprint planning fills it in.

---

## Required inputs

- **Project type.** New brand build, rebrand, single landing page, campaign, identity refresh, website refresh, microsite, product launch. The type implies a default phase decomposition that the skill adapts to the specific project.
- **Team composition.** Total size and role mix. Solo, small (2-3), medium (4-7), large (8+). Whether AI agents (Claude Code, Claude in Chrome, others) participate in production, QA, or both.
- **Tool stack.** Which of Jira, Linear, Notion, Figma, GitHub the team uses. Plus QA tooling (Playwright, Chrome MCP, Windows MCP, mobile testing harnesses) if known. Plus communication and paging channel (Slack, email, in-tool mention). The output adapts to the actual stack.
- **Timeline target.** Express (compressed timelines, fewer reviewers, accept higher rework risk), standard (typical cadence at the project type's default duration), or thorough (more reviewers, formal phase reviews, lower rework risk at the cost of slower delivery).
- **Existing constraints.** What is already locked? Brief approved, identity locked, platform fixed, brand voice already shipped, content management system non-negotiable. The orchestrator plan handles greenfield and mid-flight equally; the existing constraints input is how mid-flight projects are accommodated.
- **AI agent participation.** Which workflows include agents and at what fidelity. Examples: Claude Code does production tasks against a state file in the repo; Claude in Chrome runs human-readable QA flows on the staging deployment; the agent has access to the Linear MCP and the GitHub MCP but not Jira; the agent can move tickets between Todo, In Progress, Waiting, and Blocked but cannot move to Done (Done requires a human verification step).
- **Risk profile.** Optional input naming the failure modes the team is most worried about: brief drift, parallel-work conflicts, QA gaps, agent runaway. The orchestration plan front-loads mitigations for the named risks.

---

## The framework: 7 considerations for orchestration

A delivery orchestration plan sits at the intersection of seven considerations. Each filters the choices that follow.

### 1. Phasing

How the project decomposes into phases. The standard shape is discovery, direction, identity, production, QA, and launch. Not every project type uses every phase. A campaign skips identity (it inherits the locked brand identity). A landing page collapses discovery and direction into a sin
accessibility-auditSkill

Run a comprehensive WCAG accessibility audit covering perceivable, operable, understandable, and robust principles. Use this skill whenever the user wants to audit accessibility, review WCAG compliance, fix accessibility issues, prepare for accessibility certification, address an accessibility lawsuit risk, or systematically improve a site's accessibility. Triggers on accessibility audit, WCAG audit, a11y audit, accessibility compliance, ADA compliance, screen reader test, keyboard navigation, accessibility report, fix accessibility, axe scan. Also triggers when accessibility issues have been reported and need systematic remediation.

ads-creative-developmentSkill

How to produce ad creative that converts at performance scale. Hook patterns, format selection, video pacing, variation systems, sequential testing methodology, fatigue detection, brand-voice alignment without conversion dilution, and platform-specific creative norms. Triggers on ad creative, ad design, hook patterns, ad video pacing, creative testing, ad variations, creative refresh, creative fatigue, refresh ad creative, video ads for Meta, TikTok creative, LinkedIn ad creative, ad asset library. Also triggers when a team is producing creative at scale, planning a creative test cycle, or auditing why creative is not converting.

ads-performance-analyticsSkill

How to read paid media dashboards without fooling yourself. Attribution models, platform reporting quirks, multi-platform reconciliation, ROAS vs LTV horizon traps, statistical noise in performance metrics, incrementality testing, and the failure modes that produce expensive lessons. Triggers on read paid media dashboard, attribution analysis, ROAS vs LTV, multi-platform reconciliation, ad incrementality, geo holdout, conversion lift study, ghost bidding, paid media reporting, board-deck paid media metrics, blended CAC, MMM, MTA, last-click attribution. Also triggers when a marketer is about to scale, kill, or rebudget a campaign based on platform metrics, or when reconciling platform reports against warehouse revenue.

after-action-reportSkill

Run a structured after-action review (postmortem, retrospective) on a launch, incident, or completed project to capture timeline, root cause analysis, contributing factors, and actionable lessons. Use this skill whenever the user wants to run a postmortem, retrospective, AAR, or after-action review on any past event. Triggers on after-action report, AAR, postmortem, retrospective, retro, post-incident review, what went well what didn't, lessons learned, blameless postmortem, root cause analysis, RCA, five whys. Also triggers when the user has just shipped something or just resolved an incident and wants to capture learnings.

ai-content-collaborationSkill

How humans and AI compose in content workflows. Where AI legitimately participates, where humans must own, hybrid workflow patterns, voice ownership preservation, the AI slop problem, disclosure and transparency, team calibration, and the ethics of intellectually honest AI-assisted content production. Triggers on AI content workflow, AI-assisted writing, hybrid content production, AI in editorial, AI slop, AI disclosure, AI usage policy, AI content ethics, voice preservation with AI, team AI calibration. Also triggers when content feels generic despite quality tools, when team AI usage has drifted into inconsistency, or when a regulated or trust-sensitive context requires explicit AI policy.

analytics-strategySkill

Design measurement frameworks including event taxonomy, KPI hierarchy, dashboard architecture, attribution models, and analytics implementation strategy. Use this skill whenever the user wants to plan analytics, design dashboards, build event taxonomies, define KPIs, set up tracking, or audit existing measurement. Triggers on analytics strategy, measurement plan, event taxonomy, tracking plan, KPI framework, dashboard design, north star metric, attribution model, conversion tracking, GA4 setup, Mixpanel setup, analytics audit. Also triggers when the user has data but no clear way to use it, or wants to make decisions but doesn't know what to track.

art-directionSkill

Direct visual and creative work for campaigns, photography, illustration, video, and branded experiences. Use this skill whenever the user wants to brief a photographer, direct illustrators, plan a creative campaign, develop visual concepts, write a creative direction document, or evaluate creative work for fit. Triggers on art direction, photo brief, photography brief, illustration brief, campaign concept, creative concept, visual direction, mood board, look and feel, visual treatment, video direction. Also triggers when the user has approved brand identity but needs to extend it into specific creative deliverables.

backup-and-disaster-recoverySkill

Plan and run backups, set recovery objectives, and run disaster recovery drills. Use this skill when defining RPO/RTO targets, designing backup architecture, deciding what to back up and how often, planning for full-region or platform outages, or running a restoration drill. Triggers on backup, restore, RPO, RTO, disaster recovery, DR, business continuity, what if the database is gone, what if our hosting goes down, recovery drill, ransomware planning. Also triggers when an incident reveals a gap in restoration capability.